Construction of well foundations for the planned Drachensteg including:
- Earthworks and dismantling measures for the production of the work plan
- Production of 83 well foundations including earthworks, production of structural steel reinforcement cages and concrete work
Remove and dispose of 770 m2 of turf/ruderal vegetation
Loosening and storing 204 m3 of topsoil
Loosening and storing 270 m3 of soil
Reinstall 250 m3 of floor
Construct 300 m2 construction road
45 pcs. well foundation, d = 1.50m, depth up to 4.00m
38 pcs. well foundation, d = 1.20m, depth up to 4.00m
270 m3 concrete C25/30
12000 kg reinforcement B500A