Drachensteg Brunnengründung

Construction of well foundations for the planned Drachensteg including:

- Earthworks and dismantling measures for the production of the work plan

- Production of 83 well foundations including earthworks, production of structural steel reinforcement cages and concrete work

Remove and dispose of 770 m2 of turf/ruderal vegetation

Loosening and storing 204 m3 of topsoil

Loosening and storing 270 m3 of soil

Reinstall 250 m3 of floor

Construct 300 m2 construction road

45 pcs. well foundation, d = 1.50m, depth up to 4.00m

38 pcs. well foundation, d = 1.20m, depth up to 4.00m

270 m3 concrete C25/30

12000 kg reinforcement B500A

Download full details as .pdf
The Buyer:
Furth im Wald 2025 gGmbH
CPV Code(s):
45112000 - Excavating and earthmoving work
45221250 - Underground work other than tunnels, shafts and subways
45262210 - Foundation work