New office and laboratory building (GO IN II)
New office and laboratory building (GO IN II) in the Potsdam-Golm Science Park.
facade construction
2 900 m 2nd Curtain wall with large-format metal plates and 180 mm thermal insulation 032 and thermally separated metal substructure, of which 2 705 m 2nd in the color RAL 9016 glossy white and 200 m 2nd in the color copper metallic, 313 m parapet cover, 190 m VHF fire barrier horizontal, 35 m VHF fire barrier vertical, 122 m 2nd Base cladding made of metal on XPS thermal insulation, 1 pc metal cladding round support, 100 pc permanent scaffold anchors.