Airport buildings construction work | Tenderlake

Airport buildings construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 October 2023
Closing Date:
30 October 2023
Location(s):
DE21B Freising (DE Germany/DEUTSCHLAND)
Description:
2023-1003747_Flughafen München_Hangar 4 - Roof renovation with replacement of SHEV systems

FMG intends to carry out a flat roof renovation of the aircraft maintenance building Hangar 4 at Munich Airport, Wartungsallee. According to the budget, the renovation measure is scheduled to start in spring 2024 and be carried out by the end of 2025.

The scope of the renovation includes the hall roof of Hangar 4, with a rectangular floor plan and approx. 13,0000 m² of space. The flat roof has an approximate height above ground level of about 32 m. The roof area is divided in the southern area by an approx. 153m long, continuous light strip. In the southern area is the maintenance aisle. On the main roof surface, approx. 70 SHEV flaps are arranged at regular intervals. In the course of the roof surface renovation, the attachments of the SHEVs are to be replaced and adapted to the new fire protection concept.

The building is located in the security area of the airport, and is currently used by an airline as a maintenance hangar for regular maintenance and repair of aircraft. During the construction period, the airline will clear the hall so that the work can be carried out undisturbed. The surrounding buildings, including the adjacent office extensions, are in regular operation, in some cases around the clock. There is operational traffic on the roads around the building. To the south of the hall is the apron.

Previous findings and deficiencies:

- Ageing characteristics of PVC waterproofing membranes

- moderate stresses on the waterproofing hoists

- Damage to the roof waterproofing

- partially insufficient connections

The restructuring measure will include, among others, the following services:

- Construction site equipment with roof access

- Temporary flat roof fall protection/scaffolding

- Erection of construction fences

- Demolition of lightning protection system

- Demolition of the existing roof structure

- Vapor barrier/makeshift sealing

- Application of the new roof structure

- Design of the sealing connections

- Installation of new smoke extraction dampers

- Application of new lightning protection holders

- Tinsmith work

- Installation of on-site roof drains

- Retrofitting of on-site roof drains for emergency drainage

- Load-bearing railing at the edge of the roof as fall protection

The aim of the measure is the production of a functional and long-lasting roof structure according to the generally recognized rules of technology, whereby the most economical solution for implementation and building maintenance is sought.

Download full details as .pdf
The Buyer:
Flughafen München GmbH
CPV Code(s):
45213331 - Airport buildings construction work
45260000 - Roof works and other special trade construction works
45261210 - Roof-covering work
45261220 - Roof-painting and other coating work
45261300 - Flashing and guttering work
45261900 - Roof repair and maintenance work
45262670 - Metalworking
45312100 - Fire-alarm system installation work