The assignment mainly consists of:
Essentials:
— The dismantling and construction (renewal) of railway equipment in main and auxiliary tracks,
— The break-up and construction (renewal) of railway bars, sleepers and ballast in main and track tracks.
All kinds of:
— The tugging, levelling and aligning of tracks and railways,
- Excavation of soil and ballast with takeover,
- Collection, unloading and processing or sifting of ballast,
— Construction of side and traffic paths (different types) and service transitions,
- Carrying out aluminothermic welding,
- voltage regulation,
- rust removal of rails,
- placing GIVs,
- delivering logistics services,
- Equipped with a construction site,
— Installation of a drainage and drainage system (with sewerage and surveillance puts),
— Placing of canal trenches,
— Renewal of contemplating with road works,
— General road works,
— Places, maintenance and removal of road signalling,
— Cable works (moving and deepening cables),
- Installation of cable slots, waiting pipes and draw wells,
- The breaking out and (re) laying of flooring in and around the tracks,
— Maintenance work on tracks,
- Placing and breaking down temporary speed signals,
— Places of safety equipment,
— Adaptation works to tracks when working by other boards,
— Trading of different rail materials (rails, sleepers, switches, UT, ... ),
— Acquisition of various (outbreak) materials,
- Provision of hydraulic crane and truck with operator,
- Provision of qualified railway workers,
- ...
See cutlery