Execution of the service of felling trees, shrubs, undergrowth and branches and reconstruction of the technological belt near the active HV and MV power lines in the area of operation of PGE Dystrybucja S.A. Łódź Branch divided into 44 parts.
Detailed description of the object of the order is Annex 1 to SWZ
Part 1 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 91.69 kmPart 1 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 91.69 km
Part 10 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE2 with a total length of about 91.89 kmPart 10 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE2 with a total length of about 91.89 km
Part 11 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE2 with a total length of about 119.19 kmPart 11 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE2 with a total length of about 119.19 km
Part 12 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 97.48 kmPart 12 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 97.48 km
Part 13 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 91.5 kmPart 13 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 91.5 km
Part 14 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 93.88 kmPart 14 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 93.88 km
Part 15 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 93.53 kmPart 15 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 93.53 km
Part 16 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 69.81 kmPart 16 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 69.81 km
Part 17 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 93.41 kmPart 17 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 93.41 km
Part 18 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 87.13 kmPart 18 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE3 with a total length of about 87.13 km
Part 19 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 74.63 kmPart 19 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 74.63 km
Part 2 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 96.62 kmPart 2 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 96.62 km
Part 20 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 86.1 kmPart 20 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 86.1 km
Part 21 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 92.17 kmPart 21 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 92.17 km
Part 22 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 50.81 kmPart 22 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 50.81 km
Part 23 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 94.6 kmPart 23 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE4 with a total length of about 94.6 km
Part 24 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 114.87 kmPart 24 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 114.87 km
Part 25 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 88.12 kmPart 25 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 88.12 km
Part 26 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 83.36 kmPart 26 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 83.36 km
Part 27 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 74.67 kmPart 27 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE5 with a total length of about 74.67 km
Part 28 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 72.99 kmPart 28 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 72.99 km
Part 29 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 114.59 kmPart 29 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 114.59 km
Part 3 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 95.24 kmPart 3 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 95.24 km
Part 30 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 78.83 kmPart 30 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 78.83 km
Part 31 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 135.07 kmPart 31 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE6 with a total length of about 135.07 km
Part 32 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE7 with a total length of about 22.42 kmPart 32 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE7 with a total length of about 22.42 km
Part 33 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 72.36 kmPart 33 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 72.36 km
Part 34 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 69.27 kmPart 34 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 69.27 km
Part 35 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 68.91 kmPart 35 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 68.91 km
Part 36 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 59.48 kmPart 36 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 59.48 km
Part 37 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 54.06 kmPart 37 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 54.06 km
Part 38 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 85.21 kmPart 38 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE8 with a total length of about 85.21 km
Part 39 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 69.98 kmPart 39 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 69.98 km
Part 4 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 97.71 kmPart 4 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 97.71 km
Part 40 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 64.7 kmPart 40 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 64.7 km
Part 41 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 69.44 kmPart 41 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 69.44 km
Part 42 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 73.07 kmPart 42 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 73.07 km
Part 43 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 66.47 kmPart 43 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 66.47 km
Part 44 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 75.19 kmPart 44 Felling of trees, shrubs, undergrowth and branches in the belt of active HV power lines in the area of operation of the Łódź Branch: Head office with a total length of about 75.19 km
Part 5 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 88.38 kmPart 5 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 88.38 km
Part 6 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 96.31 kmPart 6 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 96.31 km
Part 7 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 83.9 kmPart 7 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 83.9 km
Part 8 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 48.15 kmPart 8 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE1 with a total length of about 48.15 km
Part 9 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE2 with a total length of about 108.24 kmPart 9 Felling of trees, shrubs, undergrowth and branches in the belt of active MV power lines in the area of operation of the Łódź Branch: RE2 with a total length of about 108.24 km