The award procedure: competitive dialogue procedure The Municipality of Armentières is indeed not in a position to define alone and in advance the technical assembly to meet its needs: - offer a global response in terms of energy performance of equipment with very different technical and technological operations - continue the efficiency of current operating expenses, search for the best compromise between necessary performance and costs, - evolution of the technicality in terms of public lighting and related installations so that the choices to be made by the Commune d'Armentières are strongly complexifiés.la Commune d'Armentières does not have the necessary technical skills to define alone the solutions that meet the needs it has defined
Information elements on the heritage of works to be exploited: - underground networks about 29 km - overhead networks about 41 km in twisted cable (Prc) and 9 km of bare copper network - public lighting: 2,660 light points - 78 cabinets including: - independent private areas "Courtyard": 70 light points - recessed floor and strips: 162 light points - 240 linear meters - Outdoor lighting of sports equipment: 189 light points - 2 cabinets, distributed as follows: - Léo Lagrange Sports Complex: - 1 wardrobe - Field of honor (football): 48 light points - Field of honor (rugby): 28 light points - synthetic field (football): 12 light points - training (rugby): 8 light points - training plain: 12 light points - outdoor bowling alley: 9 light points - outdoor bowling alley - Outdoor bowling alley: 4 light points - City Stadium: 6 light points - canine center: 6 light points - LED pedestrian path: 33 light points - SHP pedestrian path: 25 light points - EPSM complex: - 1 wardrobe - football field: 6 light points - Enhancement lighting: 39 light points + DMX - Cabinets integrated into public lighting - Fairground terminals: 10 terminals - Access control equipment: 23 Retractable bollards - Urban protection video: About fifty camera power supplies to manage - festive illuminations: 7 curtains of light, 37 garlands in the trees, 64 patterns on pole, 63 patterns street crossing, 9 patterns garland crossing of ruell market is scheduled to start on 22/06/2023. It will focus on:A. Administrative management of the contract: Post G0.B. Administrative management of energy: Post G1C. Management - maintenance - guarantee of results: Post G2.D. Interventions and works following events such as accidents, vandalism, bad weather etc. (Item G3 Np) and related to the evolution of the assets (Item G3 P) during the term of the contract. Improvement/renovation of facilities: Post G4.F. Interventions (pose-drop-off), related to the festive illuminations: Station G5