This measure covers:
- Demolition of the existing rear arch weir
- New construction of a doubtful damper system including road bridge
- New construction of a fish ladder, structurally connected to the weir
- Renewal of an existing berth for the WSV
- Renewal of the EI&C technology at the weir Mühlenarm.
- Technical processing including preparation of all documents required for the execution and commissioning of the weirs
- Preparation of inventory documents
- Complete demolition of the existing weir system with bridge superstructure incl. deep foundation
- New construction of weir system with fish ladder as well as berth in the upper water and creation of a shallow water zone in the underwater
Essentially consisting of:
- Steel sheet piles supply: approx. 555 t
- Installing steel sheet piles: approx. 5325 sqm
- Making micropiles: approx. 185 pieces
- Produce underwater concrete: approx. 3200 cbm
- Produce concrete and reinforced concrete of hydraulic engineering: approx. 5300 cbm
- Installing reinforcing steel: approx. 550 t
- Manufacture and install steel water components and steel water components: approx. 255 t
- Steel installation and steel components Manufacture and install machine technology: approx. 46 t
New bridge superstructure:
- Manufacture steel superstructure: approx. 92 t
- Bridge area (steel composite): approx. 282 sqm