The temperature of the swimming pools (reactor building) during MIS interventions must be between 15
Our needs relate in particular to the following services:
- interventions on CNPE to ensure the cooling or heating of the temperature of the reactor building pool;
- maintenance of cold groups and load bench.
The different services are: development, qualification of Interventions on sites; maintenance in operational conditions.
Over the entire French nuclear fleet, we envisage volumes of the order of one to several intervention (s) per year.