The subject of the contract are services consisting in the preparation of design documentation for thermomodernization and modernization of the facility of the Technical and General Education School Complex No. 2 in Katowice, 131 Mikołowska Street and the extension of the existing PV installation.
A. A detailed description of the subject of the contract is contained in:
a) a detailed description of the subject of the contract (hereinafter referred to as SOPZ) – Annex 7 to the SWZ,
b) in the model contract – Annex 3 to the SWZ,
B. Scope of the contract covered by the option right:
Exercising author's supervision during the implementation of construction works in the scope of developed design documentation.
The subject of the contract are services consisting in the preparation of design documentation for thermomodernization and modernization of the facility of the Technical and General Education School Complex No. 2 in Katowice, 131 Mikołowska Street and the extension of the existing PV installation.
A. A detailed description of the subject of the contract is contained in:
a) a detailed description of the subject of the contract (hereinafter referred to as SOPZ) – Annex 7 to the SWZ,
b) in the model contract – Annex 3 to the SWZ,
B. The material scope of the project documentation should include the performance of the following works:
1. making an up-to-date map for design purposes,
2. execution of construction and installation inventory,
3. preparation of an expert opinion on the technical condition of the facility,
4. development of a construction project and obtaining all opinions, agreements, decisions and other documents necessary for the proper implementation of construction works,
5. development of an executive design (divided into industries),
6. development of Technical Specifications for the Execution and Acceptance of Construction Works (divided into industries),
7. preparation of a bill of quantities (divided into industries and stages),
8. preparation of investor cost estimates (divided into industries and stages),
9. development of an energy audit taking into account the comprehensive thermo-modernization of the building along with the implementation of the energy performance certificate of the building,
10. development of a collective table of integrated elements (Annex 3 to SOPZ),
11. adaptation of the designed ZSTiO 2 installations to the assumptions of the study attached to the OPZ entitled: Functional and Utility Program of the applied I&C and its integration with the "System of monitoring energy and water carriers with the possibility of control in public utility facilities of the city of Katowice – SMiS" (Annex 1 to SOPZ),
12. exercising author's supervision during the execution of construction works on the basis of documentation prepared by the Design Unit - if the Contracting Authority obliges the Contractor in writing to exercise it, planning 10 stays of the designer on the construction site - the scope of the contract covered by the right of option.
C. Basic information about the object:
- main building:
• Year built: 1950
• Area: 2 860 m2
• volume: 13 996 m3
• Heating surface: 2 850 m2
• heating volume: 11 500 m3
• number of underground floors: 1
• number of storeys: 3
-gym:
• Year of construction : 2018
• footprint area: 2 051,75 m2
• usable area: 2 617,08 m2
• volume: 14 878,40 m3
D. Scope of the contract covered by the right of option: Exercising author's supervision during the execution of construction works in the scope of the developed design documentation.