“As part of the construction project “" dune park Grömitz "”: here
supply electric, are two transformer stations
(handover station and compact station).
These are used to provide for the still to be built
building structures. The supply of the UEST is done via the
local utility. The construction of the stations takes place
in the dike foreland, which results in both stations at approx.
0.6 m above earth level old stock must be erected. For this,
to make appropriate arrangements with the supplier.”
“As part of the construction project “" dune park Grömitz "”: here
supply electric, are two transformer stations
(handover station and compact station).
These are used to provide for the still to be built
building structures. The supply of the UEST is done via the
local utility. The construction of the stations takes place
in the dike foreland, which results in both stations at approx.
0.6 m above earth level old stock must be erected. For this,
to make appropriate arrangements with the supplier.”