Design, construction and development of the Comtat Venaissin detention center, for the construction of 400 new detention places. This represents a creation of approximately 16,000 m
The missions include the constitution and the follow-up of the instruction of the administrative authorization files, the design studies, the execution studies, the realization of new works on Entraigues-sur-la-Sorgue (including VRD) and the development of the penitentiary center. It is planned to set up a BIM procedure on the operation.