S 177 New construction Radeberg BAB A4 - Lot 8.4.3 Ponds chicken farm
New building S 177 Radeberg - BAB A 4
Lot 8.4.3: Ponds chicken farm (compensatory measure A 14.2)
Gross amounts:
• Construction site equipment incl. approx. 30 m construction road
• Approx. 2,500 m² explosive ordnance investigation for the entire construction site including access roads/storage areas
• Clearance of the approx. 1,200 m² construction site including felling and clearing work
• Dewatering with pumps during construction
• Teichentleerung
• Approx. 200 m³ demolition and disposal of concrete
• Approx. 1,900 m³ of excavated earth for pond profiling, including removal and disposal
• approx. 600 m² mineral seal
• approx. 7 m² channel protection with gravel
• approx. 5 m² laying of concrete lattice blocks plus installation of stepping stones in an embankment
• Creation of habitat elements from field stones and rootstocks
• Filling of the new pond including water delivery
• Planting of 30 aquatic plants
• approx. 600 m² restoration of the construction site with lawn sowing including finishing maintenance