repair work on communal and intercommunal roads in the department of Lozère
roads 2023 phase 1 sector 04 LangogneBituminous concrete: 496 T
Part-time jobs: 36 T
Cold asphalt: 1,271 M2
road 2023 phase 1 sector 07 Gévaudancold dense asphalt: 955 T
Bituminous concrete 0/10 : 849 T
Gnt : 4 795 T
Riprap: 945 m3
Excavated material: 3,160 m3
Disbursement: 2,088 m3
road 2023 phase 1 sector 08 La Canourgue / Chanacsevere emulsion: 871 T
Bituminous concrete: 600 T
Bilayer coating: 9,575 M2
Severe bitumen: 285 T
Gnt : 470 M3
roads 2023 phase 1 sector 10 MendeBituminous concrete: 478 T
Gnt : 703 M3
Limestone masonry: 70 M3
Roadside planing: 3,200 M2
road 2023 phase 1 sector 11 Massegros Causses Gorgesbilayer coating: 5,155 M2
Bitumienux concrete 0/10 : 160 T
Gnt 0/31,5 : 350 M3
Impregnation: 6,205 m2
roads 2023 phase 1 sector 17 Villefortbituminous concrete 0/10: 403 T
Ditch cleaning: 1,380 M