Description:
Comprehensive renovation of the water main DN 1000 mm using the "CIPP" method or polyurea coatings Koźmice Wielkie in Wieliczka

The subject of the contract is a comprehensive renovation of the water main DN 1000 mm using the "CIPP" method or polyurea coatings on the section from the chamber with the self-closing gate KZs-4, Journal No. 837 Koźmice Wielkie to the switching chamber KP-2, Journal No. 297/11 Koźmice Wielkie and on the section from Różana Street in Wieliczka No. 295/2 to the KP-4 switching chamber in Wieliczka No. 235/9.

The renovation of the DN 1000 bus in the above-mentioned sections is planned for implementation in 2023/2024.

Continued in swz.

The subject of the contract is a comprehensive renovation of the water main DN 1000 mm using the "CIPP" method or polyurea coatings on the section from the chamber with the self-closing gate KZs-4, Journal No. 837 Koźmice Wielkie to the switching chamber KP-2, Journal No. 297/11 Koźmice Wielkie and on the section from Różana Street in Wieliczka No. 295/2 to the KP-4 switching chamber in Wieliczka No. 235/9.

The renovation of the DN 1000 bus in the above-mentioned sections is planned for implementation in 2023/2024. The task was divided into 2 stages:

• Stage I planned for implementation in 2023, the beginning of the section of Różana Street in Wieliczka No. 295/2 the end of the section at the KP-4 switching chamber in Wieliczka No. 235/9 – 295 m, and the section from the chamber with the self-closing gate KZs-4 Journal No. 837 Koźmice Wielkie to the plot 841/4 Koźmice Wielkie (transmission easement on the above-mentioned plot) – 200 m. Total stage I: 495 m

• Stage II planned for implementation in 2024 from plot 841/4 Koźmice Wielkie (transmission easement on the above-mentioned plot) to the KP-2 switching chamber Journal No. 297/11 Koźmice Wielkie – 1100 m

The total length of the water supply to be repaired in stages I and II - about 1595 m. Measurements of the length of the sections were made on the basis of geodetic bases and as-built documentation.

Detailed implementation conditions are specified in the specification and PFU.