- realization of the primary roads: V1 - V2 - V3a and V3b,
- V5-V6 services and pedestrian / cycle paths,
- connections to the existing periphery of the Zac:
- roundabout on the ramp of the A15,
- crossroads on the rue de Paris (RD14),
- networks including public lighting,
- servicing of the lots and the school group,
- development of green spaces, garden plot, parvis of the school group, pedestrian walkways / associated cycles,
-- urban furniture,
- installation of a regulation light on the ramp of the A15,
- partial demolition of the leapfrog (RD14 in the direction of Saint-Ouen-l'Aumône - Pierrelaye) after commissioning of the tracks V1 and V2.
- Preparatory work / pre-works / earthworks / roads / sanitation surface rainwater - wet networks - dry networks
- the site installations and signage specific to lot 02,
- any additional investigations to be carried out on the existing networks, according to DQE and BPU attached to this consultation,
- soil preparation work,
- the additional disbursements necessary according to the nature of the plantations,
- Lot 1 in front of earthworks at - 0.30 m from the final level of green space surfaces,
- supply and installation of anti-root geotextile,
- the supply and planting of plants,
- the protections,
- the guarantee of recovery of plants including maintenance,
- the preparation of the plans of inventory and file of executed works (DOE).
- the site installations and signage specific to lot 03,
- any additional investigations to be carried out on the existing networks, according to DQE and BPU attached to this consultation,
- the execution of trenches in cuttings / embankments,
- the supply and installation of the sleeves, various rooms of prints, looks,
- supply and installation of the earth cable,
- the supply and installation of a CAC cabinet, a traffic light, a dynamic pre-signaling panel, a queue sensor, junction boxes,
- the supply and pulling of CFO and CFA cables
- the connection to the existing Sirius network,
- the BT connection (energy),
- the drawing up of the plans of proofing and File of executed works (Doe).