the overall project linked to this contract is the installation of turbine on the reserved flow of the Rabodanges hydroelectric development (61). This contract notice concerns the GROUPE lot. Lots IEG CC HTA and GC are the subject of separate contract notices.
The purpose of this contract is the turbine of the flow reserved for the Rabodanges hydroelectric plant
The purpose of this contract is the turbine of the flow reserved for the Rabodanges hydroelectric plant and in particular:
- The supply and installation of a turbogenerator unit,
- The supply and installation of a guard valve,
- The supply and installation of a bypass valve at the Qr,
- The supply and installation of an oleohydraulic power plant,
The main objectives and constraints of the Market are as follows:
- The implementation of all hydromechanical equipment necessary for the production and optimal exploitation of the reserved flow,
- The operation is provisionally scheduled between June 2024 and September 2024.
The main characteristics of the equipment are as follows:
- Drop height: between 10 and 13.5m
- Flow rate: 1200 l/s
- Type of turbine : Francis (horizontal)
- Asynchronous generator (160kW)
- Rotational speed: 600rpm
This list is not exhaustive. The total scope will be described in a specification which will be attached to the consultation file.