construction work for a new school group. The establishment will have 5 kindergarten classes, 6 elementary classes, 4 shared classes as well as a refectory and a CLAE
Lot 1 - VRDLot 1 - VRD
lot 10 - paintlot 10 - paint
lot 11 - hard floor coverings and earthenwarelot 11 - hard floor coverings and earthenware
lot 12 - flexible floor coveringslot 12 - flexible floor coverings
lot 13 - kitchenlot 13 - kitchen
lot 14 - elevatorlot 14 - elevator
lot 15 - electricity - low current - high current - SSilot 15 - electricity - low current - high current - SSi
lot 16 - heating - ventilation - plumbing - geothermallot 16 - heating - ventilation - plumbing - geothermal
lot 17 - green spaceslot 17 - green spaces
lot 2 - large worklot 2 - large work
lot 3 - wood structure - mixed floor - wood frame walls - wood cladding - 5th facade - roofinglot 3 - wood structure - mixed floor - wood frame walls - wood cladding - 5th facade - roofing
lot 4 - watertightnesslot 4 - watertightness
lot 5 - facade claddinglot 5 - facade cladding
lot 6 - exterior carpentry - blackoutslot 6 - exterior carpentry - blackouts
lot 7 - locksmithlot 7 - locksmith
lot 8 - plastering - insulation - false ceilinglot 8 - plastering - insulation - false ceiling
lot 9 - wood interior carpentrylot 9 - wood interior carpentry