Building automation for the Vechta prison
The Vechta prison is building a new kitchen building at Citadel 17 in Vechta. The TGA consists of 3 ventilation systems, a CHP module with boiler, buffer cylinder, WWB and 3 heating circuits. The fault and operating messages from the NEA, UV and parts of kitchen technology are switched on. The ZKA is connected via a KNX gateway. The output is about 450 DP. The operating concept provides graphical operation on site via a panel PC with fully fledged GA software.
The call for tenders also includes a GA server with an operating station that will be set up in the office of the technical manager in the existing women's prison building in the trial office. The building's TGA must be connected to the GA server. The network connection between the buildings is created on site. The services are to be carried out in accordance with AMEV 2017 BACnet and AMEV 2019 GA. The execution period is 03 to 08/2022
Building automation for the Vechta prison
The Vechta prison is building a new kitchen building at Citadel 17 in Vechta. The TGA consists of 3 ventilation systems, a CHP module with boiler, buffer cylinder, WWB and 3 heating circuits. The fault and operating messages from the NEA, UV and parts of kitchen technology are switched on. The ZKA is connected via a KNX gateway. The output is about 450 DP. The operating concept provides graphical operation on site via a panel PC with fully fledged GA software.
The call for tenders also includes a GA server with an operating station that will be set up in the office of the technical manager in the existing women's prison building in the trial office. The building's TGA must be connected to the GA server. The network connection between the buildings is created on site. The services are to be carried out in accordance with AMEV 2017 BACnet and AMEV 2019 GA. The execution period is 03 to 08/2022