B 28, new building between Rottenburg and Tübingen, construction phase 2,
Building 9.2 and road works near Tübingen-Weilheim.
Building 9.2 (overpass):
- Static system: rigid full frame;
- Superstructure cross-sectional shape: slab;
- span: 7.80 m;
- total length of the bridge: 8.60 m;
- construction height: 0.70 m;
- Width between the railings: 11.60 m.
Road construction:
- Gravel base courses approx. 900 m
- Bituminous base layers approx. 2,200 m
- Bituminous cover layers approx. 4,700 m
- Ground movements approx. 23,000 m
- Gabion walls approx. 450 m
- concrete supporting walls approx. 400 m