The subject of the award procedure shall be the supply of:
100% green electricity and natural gas for delivery years 2022-2024 with respect to Fluvius SO's EAN connection points in the context of energy consumption for, inter alia:
(a) own buildings (electricity and natural gas);
b) cathodic protection (electricity);
(c) gas reception stations, reducers and pressure control stations (electricity and natural gas);
(d) electric car connection points (electricity);
e) connecting points on the cable network (ex-Infrax) and on the HFC (hybrid fiber coaxial) network
(ex-integan) (electricity).
The following energy supplies (electricity and/or natural gas) are not included but are part of
Other purchase files:
(a) network losses;
(b) temporary delivery to dropped professional customers;
(c) customers whose contract has come to an end (EOC);
(d) consumption at connection points with a transfer procedure without an appointment (MOZA);
(e) SODV (Social Public Service Obligation).
Own consumption of electricityThe subject of the award procedure shall be the supply of:
100% green electricity for delivery years 2022-2024 with respect to Fluvius SO's EAN connection points in the context of energy consumption for, inter alia:
(a) own buildings;
(b) cathodic protection;
(c) gas reception stations, reducers and pressure control stations;
(d) electric wagons connection points.
Own consumption of natural gasThe subject of the award procedure shall be the supply of:
Natural gas for delivery years 2022-2024 with respect to Fluvius SO's EAN connection points in the context of energy consumption for, inter alia:
(a) own buildings;
(b) gas reception stations, reducers and pressure control stations.
Network cable distribution electricity100% green electricity for delivery years 2022-2024 with respect to Fluvius SO's EAN connection points in the context of energy consumption for:
(a) connection points on the cable network (ex-Infrax) and on the HFC (hybrid fiber coaxial) network
(ex-integan) (electricity).