On Friedrich-List-Platz 2 in 01069 Dresden the new building of the joint head office of Drewag and ENSO with 2 high-rise buildings is planned and connects to the City Genter from the south. The construction site borders on Lindenaustrasse in the south. Fritz-Löffler-Str. Is located in the east. with tram tracks and in the west a neighboring property with lower buildings. The new building is planned with 2 basement levels, the construction pit is approx. 9 m deep. The cubic structure, which is staggered in height, encloses a rectangular courtyard with its five lower floors and forms a six and a 13-storey tower on its north and south sides. A building with approx. 27 200 m is created
The list of services includes the services of ventilation technology.
The following ventilation and air conditioning systems are installed in the new main building management of ENSO / DREWAG:
4 smoke pressure systems for 2 security stairwells and 2 fire brigade lifts
Main components:
- 4 fans;
- 2 fans;
- 4 exhaust units;
- 78 pieces of smoke extraction dampers, exhaust air units, sheet steel duct system, L90 cladding, overflow elements, angle encoder, switching and control system;
- 1 piece of smoke and ventilation system for underground parking.
Main components:
- 2 smoke extraction fans 45 500 m
- 13 smoke exhaust jet fans;
- 12 smoke extraction dampers;
- 1 piece of gas warning system;
- 6 air conditioning units as supply and exhaust air systems.
Main components:
- 4 HVAC units with heat recovery max. 20,000 m
- 2 HVAC units with heat recovery max. 14,500 m
- 260 pieces of fire dampers;
- 380 floor outlet outlets;
- 250 volume flow controllers;
- 80 overflow elements;
- 7,500 m
- 5,500 m of spiral duct to NW25O;
- 6 500 pieces of pipe fittings up to NW250.
Thermal insulation for supply and exhaust air
Cold insulation for outside and exhaust air.