Ventilation installation work | Tenderlake

Ventilation installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 April 2020
Closing Date:
26 May 2020
Location(s):
DED21 Dresden, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
GHV - Joint Head Office ENSO / DREWAG - Los Raumlufttechnik

On Friedrich-List-Platz 2 in 01069 Dresden the new building of the joint head office of Drewag and ENSO with 2 high-rise buildings is planned and connects to the City Genter from the south. The construction site borders on Lindenaustrasse in the south. Fritz-Löffler-Str. Is located in the east. with tram tracks and in the west a neighboring property with lower buildings. The new building is planned with 2 basement levels, the construction pit is approx. 9 m deep. The cubic structure, which is staggered in height, encloses a rectangular courtyard with its five lower floors and forms a six and a 13-storey tower on its north and south sides. A building with approx. 27 200 m is created 2nd GFA, of which approx. 8,000 m 2nd underground GFA in 2 basements with predominant use as underground parking.

The list of services includes the services of ventilation technology.

The following ventilation and air conditioning systems are installed in the new main building management of ENSO / DREWAG:

4 smoke pressure systems for 2 security stairwells and 2 fire brigade lifts

Main components:

- 4 fans;

- 2 fans;

- 4 exhaust units;

- 78 pieces of smoke extraction dampers, exhaust air units, sheet steel duct system, L90 cladding, overflow elements, angle encoder, switching and control system;

- 1 piece of smoke and ventilation system for underground parking.

Main components:

- 2 smoke extraction fans 45 500 m 3rd / h with pipe silencers;

- 13 smoke exhaust jet fans;

- 12 smoke extraction dampers;

- 1 piece of gas warning system;

- 6 air conditioning units as supply and exhaust air systems.

Main components:

- 4 HVAC units with heat recovery max. 20,000 m 3rd /H;

- 2 HVAC units with heat recovery max. 14,500 m 3rd /H;

- 260 pieces of fire dampers;

- 380 floor outlet outlets;

- 250 volume flow controllers;

- 80 overflow elements;

- 7,500 m 2nd Duct and molded parts;

- 5,500 m of spiral duct to NW25O;

- 6 500 pieces of pipe fittings up to NW250.

Thermal insulation for supply and exhaust air

Cold insulation for outside and exhaust air.

Download full details as .pdf
The Buyer:
Projektgesellschaft Anbau CITY CENTER Dresden GmbH & Co. KG
CPV Code(s):
45331000 - Heating, ventilation and air-conditioning installation work
45331200 - Ventilation and air-conditioning installation work
45331210 - Ventilation installation work