Street full extension over approx. 370 m and road extension over approx. 190 m with drainage and shoring work as well as slope protection measures
Road construction and embankment work
Street full extension over approx. 370 m and road extension over approx. 190 m
- Topsoil works along the county road about 1 500 m
- Earth removal after homogeneous areas approx. 6,500 m
- Earth cover and fillings approx. 4 500 m
- drainage pipes DN 150mm to 400 mm approx. 750 m,
- new construction passage DN 1000mm approx. 13 m,
- Reinforced concrete bored piles DN 88cm, pile lengths from 9.00 m to 12.00 m approx. 275 St.
- Permanent anchor, anchor lengths from 15.00 m to 16.00 m approx. 165 St ,.
- Frost protection layers full extension (d = 62 cm) approx. 1 950 m
- Frost protection layers intermediate construction (d = 40 cm) approx. 600 m
- asphalt base course roadway (d = 14 cm) approx. 3,700 m
- Asphalt road surface (d = 4 cm) - only full extension area approx. 2 400 m
- Reinforced concrete head beam 1,45mx0,90m approx. 500 m
- Passive protective devices approx. 360 m,
- Marking works about 1300 m.
Slope stabilization works - main services
- Braiding made of high-strength steel approx. 3,600 m
- soil / rock nails about 1 000 pieces,
- Spiral rope anchor approx. 110 pcs,
- edge ropes approx. 2 500 m,
- Erosion protection and slope stabilization mats approx. 1 850 m