The subject of the contract is the design and delivery with assembly of solar installations and an automatic biomass-fired boiler room at public facilities in the Miejsce Piastowe commune.
1. The subject of the contract is the design and delivery with assembly of solar installations and an automatic biomass-fired boiler room at public facilities in the Miejsce Piastowe commune.
2. The subject of the task covered by this procedure is the design and construction of 6 (six) micro-installations of ON-GRID photovoltaic installations on public facilities in the commune of Miejsce Piastowe, including:
1) photovoltaic installation with a minimum power of 27.5 kWp at the ZOZ Building in Miejsce Piastowe ul. Dworska 14 - installation of the installation on roof slopes covered with trapezoidal sheet metal carried out on the basis of the project "Reconstruction of the heat management of the building occupied by SPG ZOZ in Miejsce Piastowe together with the installation of renewable energy installations",
2) photovoltaic installation No. 1 with a minimum power of 39,875 kWp at the Primary School in Miejsce Piastowe ul. Szkolna 24 - installation of panels on the flat roof,
3) photovoltaic installation No. 2 with a minimum power of 12.925 kWp at the Primary School in Miejsce Piastowe ul. Szkolna 24 - installation of panels on the flat roof,
4) solar installation with a minimum power of 39,875 kWp at the Primary School in Rogy ul. Szkolna 2 - installation installation on roofs covered with trapezoidal sheet,
5) solar installation with a minimum power of 39,875 kWp at the Primary School in Głowienka ul. Szkolna 8 - installation of panels on the flat roof,
6) photovoltaic installation with a minimum capacity of 39.875 kWp at the Primary School in Targowiska, ul. Suchodolskiego 38 - assembly of the installation on roofs covered with trapezoidal sheet metal.
Warning:
Due to restrictions related to co-financing of the Investment, the total maximum power of 3 photovoltaic installations may not be greater than 200 kWp. If panels with higher capacities than 275 Wp are proposed, the installations are to have the maximum power closest to the required minimum power.
3. The detailed scope of works (Description of the Object of the Contract) is included in Annex 1 to the ToR - PFU and Annex 1a to the ToR - Short description of the subject of the contract.