SWE Energie GmbH is planning to set up an intelligent house connection station system (IHAST system) in digitization stage 4. For this purpose, the construction of the communication infrastructure for the heating network must be established; existing house connection stations must be upgraded.
In order to connect the existing stations to the communication infrastructure for the heating network, switch cabinets must be replaced, specifically dismantling controllers, probes, cables and cables and lines and then reassembled. After assembly and upgrading, the prerequisites are met for these stations to be integrated into the communication infrastructure for the heating network
- disassembly of a total of 63 control boxes within existing house connection stations
- Delivery and installation of 63 new control boxes for the control system prev. House connection stations
- Delivery and assembly of new electric Supply lines for above mentioned control boxes from prev. sub-distribution, incl. cable laying systems
- Delivery and installation of a total of 63 new outdoor sensors
- delivery and installation of 550 new temperature sensors
- required programming of all switchgear