the Operation is divided into 3 lots and comprises 5 sections for the realization of the following works: - final development of the avenue of the Grande Piste and the streets of Foussemagne and Taxiway Sud (approx. 2000 ml) - creation of a roundabout on the Rd60 - servicing of the lots ceded (approx. 10 u) - creation of a rainwater basin (approx. 1700 m3) and 4 sewage pumping stations - development of pedestrian alleys between the Grande Piste and the Rd60 (approx. 500 ml) - requalification of the rue de l'Aéroparc (Rd60) (approx. 950 ml) - renovation of public car parks (approx. 2500 m2)
VRDmass earthwork (approx. 16,700 m3); Heavy roads (approx. 9,100 m2); Pedestrian/cycle greenway (approx. 13,100 m2); Concrete curbs and pavers (approx. 17,600 ml); Rain water and waste water sanitation (approx. 5,200 ml); Drinking water supply (approx. 470 ml); Rainwater retention basin (approx. 1,700 m3); Sewage pumping station (4 units); Fire water reserve (2 x 360 m3); etc
lighting - dry networksearthwork for trenching of dry networks (approx. 8,350 ml); Installation of luminaires (approx. 440 units); LV network draw (approx. 1,250 ml); Looks/draft chambers (approx. 90 units); Etc
green spaces - urban furnituretree planting (approx. 400 units); Shrub planting (approx. 22,000m2); Grassland and grassland areas (approx. 69,500 m2); Etc