Pumping station construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 December 2019
Closing Date:
12 February 2020
Location(s):
FRJ12 Gard (FR FRANCE)
Description:
Creation of the Maréchal Juin pumping station and the Valdegour booster station

The purpose of this consultation is the construction of the Maréchal Juin drinking water pumping station and the installation of the associated supply and discharge networks, including crossing the SNCF track and Avenue Dayan by trenchless technique. It also includes the creation of the Valdegour booster station and the demolition of several buildings.

This contract includes a social clause for each lot as well as a review clause.


Construction of the Maréchal Juin drinking water pumping station

The services covered by this lot will be settled by application of the global and fixed price entered in the DPGF.

The lead time for the entire project is set at 31 months.

For lot 1, the duration of the preparation period is fixed at 4 months. The execution time of the works is 24 months.


Construction of the Valdegour booster station

The services covered by this lot will be settled by application of the global and fixed price entered in the DPGF. The lead time for the entire project is set at 31 months. For lot 2, the duration of the preparation period is set at 2 months. The execution time of the works is 5 months.


Back-up networks: SNCF crossing and Dayan avenue

The services covered by this lot will be settled by application of the global and fixed price entered in the DPGF.

The lead time for the entire project is set at 31 months. For lot 3, the duration of the preparation period is set at 2 months. The work execution time is 5.5 months.


Supply and supply networks

The services covered by this lot will be paid for by applying the unit prices entered in the BPU.

The lead time for the entire project is set at 31 months. For lot 1, the duration of the preparation period is set at 2 months. The deadline for carrying out the work is 7 months.


House demolitions avenue Dayan and Maréchal Juin houses

The services covered by this lot will be settled by application of the global and fixed price entered in the DPGF.

The lead time for the entire project is set at 31 months. For lot 05, the duration of the preparation period is fixed at 1 month. The execution time of the works is 2 months.


Demolition station ZUP Kennedy

The services covered by this lot will be settled by application of the global and fixed price entered in the DPGF.

The lead time for the entire project is set at 31 months. For lot 06, the duration of the preparation period is fixed at 1 month. The execution time of the works is 2 months.

Download full details as .pdf
The Buyer:
Communauté d'agglomération Nîmes Métropole
CPV Code(s):
45110000 - Building demolition and wrecking work and earthmoving work
45232150 - Works related to water-distribution pipelines
45232152 - Pumping station construction work
45247270 - Reservoir construction works