For the main performance period of the framework agreement in the period from 01.01.2023 to 31.12.2023, the AG assumes an estimated call-off quantity of 33 units of full underfloor systems.
The maximum quantity of call-offs in the main performance period under this framework agreement is 49 units of full underfloor systems. If, contrary to expectations, the maximum quantity of 49 full-underfloor systems is reached before 31.12.2023, the contractual relationship ends with acceptance of the maximum quantity and fulfilment of all contractual obligations in this regard. ).
In this case, the client's unilateral option to extend the contract by 1 further year can be claimed correspondingly earlier.
For the optional extension period from 01.01.2024 to 31.12.2024 (which can also start earlier if the maximum quantity from the main service period is reached), the AG also assumes an estimated call-off quantity of 17 pieces. The maximum quantity of call-offs in the extension period for this period is 25 units of full underfloor systems. If, contrary to expectations, the maximum quantity of 25 full-underfloor systems is reached before 31.12.2024, the contractual relationship ends with the acceptance of the maximum quantity for the optional extension period and fulfilment of all contractual obligations in this regard.
-monolithically cast concrete container
-Fractions: Residual waste - Recycling containers - Paper/cardboard/cardboard -Glass
-Hot-dip galvanized steel insertion column
-Powder coated according to DIN-EN 15773
-3-Hakenaufnahme
-Galvanized, low-maintenance safety platform to secure the open concrete shaft
The complete technical specifications and minimum requirements for the full underfloor systems are set out in the tender specifications and the specifications contained in these tender documents.