Due to its useful life, the existing school building is in a condition that requires extensive repair. It is planned
to leave the supporting structure in place. Reference is made to the feasibility study regarding the remediation measures.
The space requirement of the renovated school is being met in accordance with the currently changed room program G9 for grammar schools and is the
feasibility study. It attaches great importance to economic and energy-efficient planning.
The appearance of the school building must be adapted to the sports hall, which was renovated in 2018. The implementation of
Renovation measures are to be carried out in a construction phase. For this purpose, it is necessary that the school operation is completely rebuilt into a
outdoor sports facilities to be built, container school is outsourced.
For this purpose, specialist planning services for technical building services are to be awarded HLS according to §§ 53 et seq. HOAI 2021 for the service phases 1 to 9
Become.
Due to its useful life, the existing school building is in a condition that requires extensive repair. It is planned
to leave the supporting structure in place. Reference is made to the feasibility study regarding the remediation measures. The space requirements of the
rehabilitated school is being fulfilled according to the currently changed G9 space program for grammar schools and is included in the feasibility study. It
value is placed on economic and energy-efficient planning. The appearance of the school building must take place in 2018
be adapted to the rehabilitated sports hall. The renovation measure is to be implemented in a construction phase. For this purpose, it is necessary that school operations are completely outsourced to a container school to be built on outdoor sports facilities.
For this purpose, specialist planner services for technical building equipment HLS are to be awarded for the service phases 1 to 9 in accordance with §§ 53 et seq. HOAI 2021.