Ostwind 3, planning and construction of a landing (lot 1) or land cable route (lot 2) to enable the connection of the O-1.3 wind farm in the Baltic Sea to the substation in Stilow.
Planning and construction of a landingThe bidder's task includes the design and construction of the landing for the OST-1-4 HVAC 220 kV HV cable system for the Ostwind 3 project. This allows the O-1.3 wind farm in the Baltic Sea to be connected to the substation in Stilow. Lot 1 is not a framework contract.
Planning and construction of a land cable routeThe bidder's task primarily includes the development of the execution planning and construction of the land cable route for the OST-1-4 HVAC 220 kV HV onshore cable system as part of the Ostwind 3 project. This allows the O-1.3 wind farm in the Baltic Sea to be connected to the substation in Stilow.
The sections of the land cable route that are required to lay two additional high-voltage cable systems between the landing in the Vierow port area and the planned substation ashore in Stilow parallel to OST-1-4 must also be considered and offered for the framework contract. Lot 2 becomes a framework contract, as the number of conduit systems has not yet been determined at the time of the tender (permits) and a later tender is not possible due to dependencies for the completion of the overall project Ostwind 3.