Extension of the company building of the Saarburg group sewage treatment plant - Lot 13 Heating, ventilation, sanitation
Lot 13 Heating, plumbing, ventilation
Sanitary:
- Approx. 20m dirty water pipe to be laid
- 4 floor drains
- 5 Duschanlagen
- 3 Waschtischanlagen
- 1 Ausgußbecken
- Approx. 220 m drinking water pipe to be laid (hot, cold, circulation)
- 1 hygienic rinsing station (cold water)
Heater:
- ca. 100m Heizungsleitungen
- 72 m² underfloor heating
- 4 radiators
- 1 heat exchanger
Ventilation:
- Central ventilation unit 250 m³/h
- ca. 30m Wickelfalzrohr (Sichtmontage)
Others:
- Dismantling shower systems
- Dismantling radiators
- Dismantling of drinking water pipes AP
Connection of existing hot water tanks