The demolition, existence and new construction of the state vocational school I in Bayreuth extends over three construction phases.
The scope of services of the procurement unit exterior façade extends over the construction phase BA1 and includes preparatory measures, i.e. construction site equipment, metal façade, sheet metal work and railing work.
The scope of services of the procurement unit exterior façade extends over the construction phase BA1 and includes preparatory measures, i.e. construction site equipment, metal façade, sheet metal work and railing work. The exterior façade begins after completion of the shell construction work and with the installation of the window work. The available construction site/security area for the exterior façade is limited, the existing buildings adjacent on three sides are in use during the work on the outer façade. The assembly concept must be set up according to the cramped local conditions. The safety of adjacent buildings must be guaranteed at all times.