This contract is for the engineering design services for and delivery of a complete turnkey school for 200 pupils, with an integrated multi-purpose hall (activity area 16 x 24 m). The outside area shall be developed as a part of the project, including roads, car parks and other infrastructure such as water, sewage, electricity and fiber. The contract will be executed as a turnkey contract, NS8407 with a solution proposal.
The development of the number of pupils in the catchment area is uncertain. In order to allow for possible future pupil growth, it must be possible to expand the school from 200 to 300 pupils. This expansion shall be priced as an option and will be called option 1. A future expansion of the school must be possible, independent of whether the municipality chooses to take up option 1.
There are plans closely related to the school for a nursery with 6 departments, houses and a commercial business in the form of an expansion to an existing shop. In addition, there are plans for an artificial grass pitch (11-a-side pitch), which shall be priced as an option.
This contract is for the engineering design services for and delivery of a complete turnkey school for 200 pupils, with an integrated multi-purpose hall (activity area 16 x 24 m). The outside area shall be developed as a part of the project, including roads, car parks and other infrastructure such as water, sewage, electricity and fiber. The contract will be executed as a turnkey contract, NS8407 with a solution proposal.