The required components are required to equip the PoP locations in the project areas MSE24_21, MSE24_22 and MSE24_23. These components correspond to the system standard of the new medianet.
Delivery of KeyMile MSAN The required components are required to equip the PoP locations in the project areas MSE24_21, MSE24_22 and MSE24_23. These correspond to the system standard of the new medianet.
The delivery takes place as soon as possible until July 15th, 2020 after placing the order, to the new medianet GmbH, John-Schehr-
Street 1, house 3.0. Partial deliveries are permitted.
The special exception according to Section 116 (2) GWB applies to this procedure.