The housing industry Frankfurt (Oder) GmbH will comprehensively renovate the residential complex Juri-Gagarin-Ring 1 - 41 between 2022 and 2024. The area Juri-Gagarin-Ring 1 - 41 was built in 1970 in industrial construction (IW 66/P2-5 storey). All seven residential buildings have a basement, 5 upper floors and a Drempelgeschoss. In each staircase there are 10 apartments (two-horse). A total of 359 apartments are to be renovated over the 3rd construction phases.
The services of the 3rd construction phase include the buildings Yuri Gagarin Ring 1 - 4; 5 - 9 and 10 - 14 with a total of 129 apartments after renovation.
The renovation works will be put out to tender in lots:
Lot 301 Baustraße
Lot 303 Crane operated dismantling
Lot 304 Demolition and gutting
Lot 305 Scaffolding
Lot 306a Shell construction and plastering work
The 306b Betonschneidarbeiten
Lot 306c locksmith work
Lot 307 Civil engineering work and outdoor facilities
Lot 308 EIFS and façade
Lot 309 Roofers
Lot 310 plastic windows
Lot 311 aluminum elements
Lot 312 Balconies/entrance stems
Lot 313 Basement ceiling and dremple insulation
Lot 314 Interior, functional and cellar doors
Lot 315 Drywall works
Lot 316 screed work
Lot 317 Painting works
Lot 318 Flooring work
Lot 319 tiling work
Lot 320 final cleaning
Lot 321 Balcony renovation (only in the 3rd BA)
Los 401 HLS
Lot 402 Electrical Work
Lot 403 Elevator systems
During the entire construction period, the apartments of the staircases J.-Gagarin-Ring 6 - 14 are mostly inhabited!
The 5 J. Gagarin Ring staircase and the J. Gagarin Ring building
1 - 4 are uninhabited, as floor plan changes are taking place here.
This invitation to tender only covers lot 306a shell construction and plastering work for the 3rd BA J.-Gagarin-Ring 1 - 4, 5; 6 - 9 and 10 - 14.
BetonschneidarbeitenJG01-04
- 26 Cancel flights of stairs
- Break off 12 platform plates
- 12 Making ceiling openings
- 60 ceiling supports for new supply shafts
- 180 pieces of wall cutting work for new lintel formations
- 2 temporary support structure
JG05
- Cancel 4 flights of stairs
- Create 18 ceiling openings
- 24 ceiling interceptors for new supply shafts
- 98 pieces of wall cutting work for new fall formations
- 1 temporary support structure
- 1 temporary bracket construction
JG06-09
- 4 Breaking off window sills
- 4 Cut back wall elements
JG10-14
- 5 Break off window sills
- 5 Cut back wall elements