Secondary school construction work | Tenderlake

Secondary school construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
15 January 2020
Closing Date:
03 February 2020
Location(s):
DE224 Deggendorf (DE Germany/DEUTSCHLAND)
Description:
Flood remediation with replacement of the St. Gotthard High School in Niederalteich. Product: Mullion-transom elements BA2

Building description - construction phase 2:

Several rectangular structures built together, z. T. between or over existing structures

Break hall ground floor:

L / W approx.21.15 mx 11.78 m, height approx.6.05 m - 7.62 m

Music wing upper floor:

L / W approx.9.23 mx 48.12 m, height approx.4.34 m - 5.62 m

Type: solid construction made of reinforced concrete and wooden stand construction

Facades: Insulated with intent

Windows: metal or wooden structures

Roof construction: carpenter-style wooden purlin roof structure (pent roof) or flat and. Glass roofs.

- approx. 325.00 m 2 Timber mullion-transom facade with glazing and insert window.

Download full details as .pdf
The Buyer:
Benediktinerabtei St. Mauritius Niederaltaich
CPV Code(s):
45210000 - Building construction work
45214220 - Secondary school construction work
45420000 - Joinery and carpentry installation work