The new sports hall will be built on the area of the previous sports ground at the school between the school building and Waldschmidtstraße
erected. The building is mainly a reinforced concrete solid construction with EIFS. The roof of the sports hall is designed as a hipped roof. The
Roof construction is designed as an explosive device with wooden trusses and steel tension struts. Buildings for
changing rooms, plumbing, technology, equipment and gallery with a green flat roof.
Exterior building dimensions: approx. 38 x 45 m
Building height: approx. 14 m
Masses
Earthworks approx. 360 m3
Belagsflächen ca. 1200 m2
Vegetationsflächen approx. 600 m2
Retaining wall H= 230 to 270 cm 2 pcs
Retaining wall H = 55 cm approx. 5 m
Sitzstufen Betonblock ca. 50 m
Events:
Publication of tender documents: 28.07.2023
Execution: September - November 2023