The Serra de Água Hydroelectric Power Plant is currently undergoing a refurbishment, in terms of the infrastructures of the accumulation and loading chambers (outdoor storage area), the penstock and the hydroelectric plant building. This
The refurbishment stems from the need to replace existing assets that were at the end of their useful life, and the opportunity was taken to provide the installation with new functionalities to support the electrical system, as well as to increase the installed capacity to around 10.8 MW.
The object of the contract to be signed includes all civil construction works, supplies, assembly and testing of electrical equipment and installations and all materials and works necessary for the operation of the different hydraulic infrastructures contemplated in this construction contract, in accordance with the Detailed Design, which constitutes Section 2 of the Tender Documents.
The Serra de Água Hydroelectric Power Plant is currently undergoing a refurbishment, in terms of the infrastructures of the accumulation and loading chambers (outdoor storage area), the penstock and the hydroelectric plant building. This
The refurbishment stems from the need to replace existing assets that were at the end of their useful life, and the opportunity was taken to provide the installation with new functionalities to support the electrical system, as well as to increase the installed capacity to around 10.8 MW.
The object of the contract to be signed includes all civil construction works, supplies, assembly and testing of electrical equipment and installations and all materials and works necessary for the operation of the different hydraulic infrastructures contemplated in this construction contract, in accordance with the Detailed Design, which constitutes Section 2 of the Tender Documents.