Flooring work as part of the renovation and reorganization of the castle perimeter development, 1st construction phase
Flooring work for the renovation and reorganization of the castle perimeter development, 1st BA.
Subsoil for the floor coverings described in the specifications in building A (Talstraße 8-10) is predominantly a vorh. floating cement screed, which can only be used in individual rooms of the basement, the 3rd floor and in the toilet rooms EG-3. Og is supplemented with new screed as cement composite or floating cement screed as well as in partial areas or small areas (defects after demolition walls, etc.).
In Building B (Talstraße 2-6) and Building C (Schlossplatz 6-7), each on the ground floor, a cement composite screed will be installed and on the upper floors (1st-3rd floor) a cement screed on an insulating layer. In buildings C 1st floor and 3rd floor, dry screed is installed in individual rooms due to pipe laying over the raw floor.