Structural work for the new building of the primary school in Wilnsdorf
BE with a tower crane in the elevator shaft
5 mobile crane missions 450 tons from 2-3 days
Sauberkeistschicht 165 m3
Magerbetonplomben 180 m3
Foundations 150 m3
Floor slab level - 1 div component thicknesses 1270 m2
Floor slab level 0 125 m3
Ceilings 2743 m3
Interior walls partly exposed concrete SB 2 280 m3
Exterior walls 95 m3
Innenstützen 30 m3
External supports + moulded beams 8 m3
Underlays and overlays 420 m
Speed bumps 115 m
Inner staircases as prefabricated elements 17 m3
Exterior stairs as prefabricated parts 10 m3
Balcony slabs as prefabricated elements 290 m3
Non-load-bearing masonry 300 m2
Stahlmassen 420 to
336 strands with L= 16.3 m 5476.8 m
Innengerüst 100 m2
Support scaffolding with tower constructions
Attic 360 m2
Level +1 360 m2
Level 0 250 m2
Total 960 m2
Scaffolding sports hall ceiling 430 m2
Excavation work sewage pipes 580 m3
Drainage pipeline infrastructure 420 m2
Grease trap 1 pc
Shafts 12 pcs
Drainage pipes under the floor slab 300 m
Erdverlegte Lüftungsleitungen DN 1000 50 m
Aufzugseinlegearbeiten
Lightning protection
Drainage
Timber construction columns+ beams BSH, NH GL 24 150 m3
Glulam ribs 80 m3
Solid ceiling 5 layer slabs 845 m2
Wood lanyards
Subordinate wooden components 20 m3
Coating basement rooms 250 m2