structural work
Construction site equipment with container system, media supply, traffic safety.
earthworks:
3900 cbm Baugrubenaushub,
1370 cbm Rohrgarbenaushub,
1600 cbm backfilling working space,
Drainage work:
800 linear metres of ground pipes,
20 pcs shafts,
lifting station and grease trap,
490 linear metres of ring and surface drainage ,
approx. 190 cbm trench for rainwater retention incl. earthworks,
Reinforced concrete works UG in WU construction,
130cbm base plate basement,
645cbm base plate ground floor,
Pile head beams on on-site cast iron driven piles.
Reinforced concrete walls in SB2, SB2, SB3 board formwork, total approx. 3090m2,
Columns, beams, upstands,
951m2 Stahlbetondecken,
flights of stairs in in-situ concrete and prefabricated design,
400 to. Structural steel
Inlays for electrical and lightning protection.
3600 m2 Abdichtungsarbeiten, Dämmarbeiten.
Conversion measures on a smaller scale in the existing building component B.