carpenter 2.
"- Dates for performing the main service on the construction site:
Start of Performance 8.11.2021; End of Performance 14.1.2022
- Description of the procurement:
—— toilet divider toilet ladies 2 cabins: 5 pieces,
—— toilet divider toilet men 1 cabin: 5 pieces,
—— Z-are without a bench: approx. 32 pieces,
—— Base with bench rest: approx. 5.5 m,
—— Freestanding bench: about 1 m”.
Dimension and technical processing: 08.11. — 19.11.2021 Prefabrication: 22.11.2021 — 31.12.2021 Assembly: 3.1.2022 — 14.1.2022.