Lichtbergschule Eiterfeld, new administration — roofing waterproofing works.
The client is planning the construction of a new building for administration in Eiterfeld as part of the overall measure for the new construction of the Lichtberg School Eiterfeld, as an early partial construction project on an existing 3-storey primary school building, which will be erected in monolithic construction.
The building body to be created is a very simple structure.
— component management — 43.5 m x 14.5 m,
— Storey: 2 full storeys,
— Brief description tradeshow: roofing waterproofing works,
— vapor barrier approx. 510 sqm,
— slope insulation EPS approx. 510 sqm,
— slope insulation MiWo approx. 125 sqm,
— roof waterproofing approx. 510 sqm,
— emergency sealing concrete slabs approx. 200 sqm,
— roof edge covers approx. 100 lfdm,
— gravel as a load of approx. 480 sqm,
— maintenance areas concrete slabs approx. 25 sqm.