extension (extension and increase approx. 13200 m³ BRI) and general renovation (approx. 33600 m³ BRI) of the state secondary school Schesslitz;
Trade-based allocation according to experts
Gewerk/LV 4/165: Tile and panel work BA 4, extension and general renovation
Gewerk/LV 4/166: Flooring work BA 4, extension and general renovation
Gewerk/LV 4/169: Lighting BA 4, extension and general renovation
Trade/LV 4/165:
Title: Tile and slab work BA 4, extension and general renovation
Quantity or scope:
Wall tiles white 30 x 60 cm approx. 250 m²
Wall tiles coloured 20 x 20 cm approx. 50 m²
Floor tiles 30 x 60 cm approx. 100 m²
Natural stone covering Jura marble grey
Sheet covering 15 mm approx. 100 m²
L-Winkelstufen Juramarmor ca. 30 m
Trade/LV 4/166:
Title: Flooring work BA 4, extension and general renovation
Quantity or scope:
Linoleumbelag ca. 1.000 m²
Upright slats oak approx. 230 m²
Trades/LV 4/169:
Designation: Lighting BA 4, extension and general renovation
Quantity or scope:
Assembly and installation of 15 linear pendant luminaires (LED) as a 4-length continuous line
Installation and installation of 12 pendant luminaires (LED) as a 3-length continuous line
Installation and installation of 21 pendant luminaires (LED) as a 2-length continuous line
Installation and installation of 14 pcs. surface-mounted luminaire wallwasher panel lamp
Installation and installation of 29 surface-mounted tub luminaires
Installation and installation of 79 pcs. built-in downlights
Installation and installation of 16 outdoor wall luminaires
Testing and measuring of the installed system