38 E 8033 - FLI Mariensee / Mecklenhorst
Permanent placement of the FLI in ME/MA
Cluster 4 - Ventilation Systems
Ventilation systems in Cluster 4 for the construction of a new research complex for the Friedrich Loeffler Institute consisting of a new building and two existing buildings.
1 HVAC system with an air volume of approx. 13,600 m3/h (with cross-plate heat recovery system);
10 tubular fans with a total air volume of approx. 1,400 m3/h;
approx. 5.50 m2 ducts and fittings in verz. Execution
approx. 280 m Wickelfalzrohr DN 80 - DN 250;
approx. 130 fire dampers; Ceiling air outlets, grilles, volume flow controllers, flaps, etc.