New construction of the Riemerling sports campus.
- approx. 2,500 m
- approx. 900 m
- approx. 10 St deciduous trees, H, mDB, StU 18-20;
- approx. 20 St solitary shrubs, mB, 100-200 h;
- approx. 565 pcs of hedge plants, mB, 125-150 h;
- approx. 3 000 pieces of small trees, shrubs and grasses, C / Tb;
- approx. 340 m
- approx. 12 pcs of precast concrete shaft DN 1000-1500 T 1.00-3.25 m
- approx. 2 St lamellar filter system DN 2500 reinforced concrete;
- approx. 122 m
- approx. 375 m sewer PP DN 110-315;
- approx. 4 pcs of yard drain class B125;
- approx. 85 m drainage channel NS 100-150 class A15-D400 concrete;
- Approx. 400 m of PE AD110 cable protection pipe, including pulling shafts;
- approx. 70 m angle support elements (wall panels) H 80-105 cm;
- approx. 48 m noise protection wall angle support elements H 280 cm;
- approx. 28 m block steps precast concrete elements 15-17 / 31-35 cm, blasted;
- approx. 1025 m curb stones concrete / granite EF 6/25, TB 8/50, TB 10/30, B6;
- approx. 68 m bus curb Kasseler special board including accessory stones;
- approx. 70 m tactile guidance system for the blind;
- approx. 260 m
- approx. 2 030 m pavement concrete pavement 20-30 / 20-30 cm D 8-10 cm,
Incl. Superstructure
- approx. 110 m steel mesh fence H 1030-1430 mm, galvanized
- approx. 1 pc fence door, frame height 100 cm, clear width 100 cm
Various items of equipment
Various demolition work.