After the demolition of the existing sanitary building, the extension of the Wilhelm-Tanck-Schule at Färberstraße 25 in Neumünster is planned as a 3-storey new building with a net floor area of approx. 2,800 m² directly adjacent to the existing listed building. The building will have a flat roof with extensive greenery and a PV system.
The roof waterproofing and plumbing work includes:
• Sealing of the sole
• Flat roof waterproofing including thermal insulation
• Degrees, provisional examinations and examinations
• Dacheinbauten
• Attikaabdeckungen
• Roof drains and downspouts
•Maintenance.