New construction and renovation of the Blaichach secondary school | Roofing work
- Flat roof waterproofing: vapor barrier bituminous, 2-layer bitumen waterproofing about 870 sq.m.;
- Insulation work: PUR/PIR, partly. as slope insulation approx. 676 sqm;
- Solar green roof: Extensive green roof approx. 840 sqm, with solar elevation on main roof approx. 172 pieces;
- Flat roof drainage: main drainage approx. 9 pieces, emergency drainage approx. 8 attic drains, 12 spouts;
- Stop constructions: approx. 12.5 running metres;
- Flat roof hatch: approx. 1 piece;
- Console light strip: complete system approx. 12.5 sqm;
- Plumbing work: Attic cover profiles approx. 210 running metres, wall connection profiles approx. 93 running metres, downpipes approx. 7 running metres