Lot 3 - Viaduct engineering structure
1 Psch Workshop planning Create steel construction
62 m borehole for ground exploration up to 10 m
Probing 24 drill holes for the absence of explosive ordnance
Loosening, transporting and storing 300 m3 of soil
Make 30 m bored piles of 75cm 6-10 deep
60m2 cleanliness layer made of C12/15, d= 20 cm thick
Bending and installing 16 t of bar steel Bst 500 B
Installing 45 m3 reinforced concrete C30/37 for pile head slab
Installing 40 m3 reinforced concrete C30/37 for abutments
Manufacture and assemble 63 t steel superstructure made of S355J2+N
115 m Manufacture and assemble tubular steel railing h=1300 mm
Install 240 m2 thin flooring RHD
60 m LED railing lighting manufactured.
Create and hand over 1 piece of building book