Construction work for steel bridges | Tenderlake

Construction work for steel bridges

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 July 2023
Closing Date:
15 August 2023
Location(s):
DED41 Chemnitz, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
New construction of the viaduct - Pleißenbach green corridor

Lot 3 - Viaduct engineering structure

1 Psch Workshop planning Create steel construction

62 m borehole for ground exploration up to 10 m

Probing 24 drill holes for the absence of explosive ordnance

Loosening, transporting and storing 300 m3 of soil

Make 30 m bored piles of 75cm 6-10 deep

60m2 cleanliness layer made of C12/15, d= 20 cm thick

Bending and installing 16 t of bar steel Bst 500 B

Installing 45 m3 reinforced concrete C30/37 for pile head slab

Installing 40 m3 reinforced concrete C30/37 for abutments

Manufacture and assemble 63 t steel superstructure made of S355J2+N

115 m Manufacture and assemble tubular steel railing h=1300 mm

Install 240 m2 thin flooring RHD

60 m LED railing lighting manufactured.

Create and hand over 1 piece of building book

Download full details as .pdf
The Buyer:
Stadt Chemnitz, Rechtsamt, Zentrale Vergabestelle
CPV Code(s):
45221115 - Construction work for steel bridges