New construction of a sewage pressure pipe for the connection of the Ehrang sewage treatment plant to the main sewage treatment plant in Trier,
VE 02 Open line laying, Moselle bank to motorway crossing,
civil engineering and pipeline construction work,
- ca. 11.500 m³ Grabenaushub
- supply and install approx. 2,610 m of PE pipes DN/OD 400
- supply and install approx. 2,610 m PVC protective pipe AD 160
- Deliver and install 3 precast reinforced concrete shafts
SWT Trier is planning to connect the Trier-Ehrang wastewater treatment plant to the main sewage treatment plant in Trier.
A new wastewater pressure pipe PE DN/OD 400, SDR 11 is laid.
A total of three flushing/control shafts will be produced in the section of the line. With the wastewater pressure pipe, an empty pipe DN/OD 160 and a multi-occupancy pipe are also laid.
For the laying of the pipeline, bound and unbound paved farm roads must be broken up and restored.