Heat distribution network for technical building equipment of the biowaste recycling plant:
- Underground pipelines in double pipe design
- Introduction into the buildings up to the heat transfer stations and to the connection point at the combined heat and power plant
- Civil engineering for pipe trenches and pipe trench backfilling is carried out on site
Wärmeverteilnetz:
- Underground pipelines in double pipe design
- Introduction to the buildings up to the heat transfer stations and the
Connection point at the combined heat and power plant
- Civil engineering for pipe trenches and pipe trench backfilling is carried out on site